Maryland approves a large-load tariff with grid costs?

Yes if order assigns grid or capacity costs

By March 31, 2027, does the Maryland Public Service Commission issue an order approving a large-load tariff for BGE, Pepco or Delmarva Power that assigns transmission or capacity costs to the large-load class?

The rule

The answer is yes if, by March 31, 2027, the Commission issues an order approving, with or without modifications, the tariff of at least one of the three utilities with a charge, rate or cost-allocation provision that applies only to the large-load class and recovers transmission costs or PJM capacity costs; collateral, a minimum term or an exit fee alone does not count.

Settles on the source the rule names.

Source: Maryland Public Service Commission, Public Conference PC72 (Large Load Customer Regulations and Tariffs)

What would move the Call

  • The 2029/2030 auction clears below $290 per megawatt-day: the new load came in without pressing the price.
  • The backstop results put most of the cost on large loads by state rule, not on the whole zone.
  • PJM sets a new, lower cap for 2030/2031 onward, which hands the bill to the generator.
Closes
Mar 30
8:00 PM ET
The thesis
Who pays for the data centers' new load: the household, the hyperscaler or the generator?

A test is listed when its specification is admitted and a divergence names two sides. The open markets →

Question, rule and source from the DeepStack engine, data as of Nov 23, 2026. Analysis and opinion, not investment advice.